Water Well /Hands Pump (Building Resilience of Poor Communities to Water Scarcity in District Bajaur KPK Pakistan

Thematic Area

Education

Donor Agency

MAUSA

Project Locations

District Bajaur

Project Description

In Pakistan, more than 30 per cent of diseases and 40 per cent of deaths are linked to unclean water. The divide is also stark between rural and urban populations; up to 70 per cent of rural Pakistan has no access to clean water.

Bajaur has an extreme climate, with temperatures plunging below 0°C in December–January and reaching as high as 36°C in June–August. Summer lasts 6 months, from May to October, with temperatures from 23°C to 36°C. Winter and spring feature frequent rain, and average annual rainfall is about 738 mm. Dipping groundwater levels and the lack of long-term water planning have compounded struggles for people in tribal districts, specifically, in Bajaur district where people use unprotected sources of drinking water e.g. springs and streams. There is no concept of water treatment or chlorination even on the Government level. Therefore, people are forced to drink contaminated water.  Gastroenteritis diseases are the common problem of this area. The main reason of the bacterial contamination seems open defecation in habitation areas and unprotected water storage tank and leaky pipelines of water supply schemes where exist.

Women staged a protest demonstration in Barang tehsil of Bajaur tribal district on Saturday against acute shortage of drinking water in the area.

Scores of women and their children marched from remote Kamal Dara village of Brang tehsil and gathered on the main Khar- Barang road, blocking it to traffic.

ANNEX 2 Completion Report

The participants of the protest, which is said to be the first such demo in the region held by women, chanted slogans against the lawmaker from the area and the administration for their silence over shortage of water in the area. (https://www.dawn.com/news/1491241)

Activities & Outputs

A total of 60 locations were identified among five Tehsil of the district during baseline survey of the vulnerable communities by field staff, in which the following below 54 locations were selected for water wells in consultation with local stakeholders and authorities after feasibility by Hydrogeologist Engineer. A construction firm was hired for the excavation of bore wells and installation of hand pumps. At each target location a fully functional hand pumps has been installed with 2.5-3 inches diameter bore-hole and 80-90 feet depth. The cemented washing pad of the hand pump is 5’ x 5’ with 10’-12’ raised from Natural surface level (NSL). UPVC pipe of diameter 1.5 inch is used for water suctions. A hand pump machine of five (5) feet length made of brass and IIL pipe is used.

S

Location /Village name 

Tehsil

District

Status

1

Tour MianKalay

Khar

Bajaur

Completed

2

Ali Jan Kalay

Khar

Bajaur

Completed

3

Sultan Kas

Khar

Bajaur

Completed

4

Khwaga Chena

Khar

Bajaur

Completed

5

Farsh Yousaf Abad

Khar

Bajaur

Completed

6

Khair Abad

Khar

Bajaur

Completed

7

Naway Kalay Patak

Khar

Bajaur

Completed

8

Said Abad Jar Daag

Khar

Bajaur

Completed

9

Redo Shahgai

Khar

Bajaur

Completed

10

Camp Muhallah yousuf abad

Khar

Bajaur

Completed

11

Shandai More

Khar

Bajaur

Completed

12

Loe Sum

Khar

Bajaur

Completed

13

Shawery Daag

Khar

Bajaur

Completed

14

Mamenzo

Khar

Bajaur

Completed

15

Chandarh Alijan

Khar

Bajaur

Completed

16

Sadiq Abad Patak

Khar

Bajaur

Completed

17

Tank Khata

Khar

Bajaur

Completed

18

Mashal colony Daag Qilla

Khar

Bajaur

Completed

19

Mola Kalay

Khar

Bajaur

Completed

20

Sahibzadgan Kalay Alijan

Khar

Bajaur

Completed

21

Civil Colony Khar

Khar

Bajaur

Completed

22

Haji Lawang

Khar

Bajaur

Completed

23

Mir Ali Qilla

Khar

Bajaur

Completed

24

Adil Chowk bypass

Khar

Bajaur

Completed

25

Sultan Abad Daag Qilla

Khar

Bajaur

Completed

26

Doda Zorbandar

Khar

Bajaur

Completed

27

Qalacha Falang

Khar

Bajaur

Completed

28

Babar Shah Tangai

Salarzai

Bajaur

Completed

29

Zara Shah

Salarzai

Bajaur

Completed

30

Balam Khar Pashat

Salarzai

Bajaur

Completed

31

Kassai

Salarzai

Bajaur

Completed

32

Ghakhai

Salarzai

Bajaur

Completed

33

Loe Johar

Salarzai

Bajaur

Completed

34

Shah Toot

Salarzai

Bajaur

Completed

35

Shagai

Salarzai

Bajaur

Completed

36

Chenagai

Salarzai

Bajaur

Completed

37

Naray Shagai

Salarzai

Bajaur

Completed

38

Pata Salay

Salarzai

Bajaur

Completed

39

Chinaro

Salarzai

Bajaur

Completed

40

Pashat Kalay

Salarzai

Bajaur

Completed

41

Shenkotay

Salarzai

Bajaur

Completed

42

Dherakai

Salarzai

Bajaur

Completed

43

Gambut

Salarzai

Bajaur

Completed

44

Tangai

Salarzai

Bajaur

Completed

45

Azamay

Uthman Khel

Bajaur

Completed

46

Geray

Uthman Khel

Bajaur

Completed

47

Mirwais Kalay Arang

Uthman Khel

Bajaur

Completed

48

Walai Arang

Uthman Khel

Bajaur

Completed

49

Naranj Kalay Arang

Uthman Khel

Bajaur

Completed

50

Shagai Arang

Uthman Khel

Bajaur

Completed

51

Aman Kot

Barang

Bajaur

Completed

52

Memol Kamal dara

Barang

Bajaur

Completed

53

Kaga kalay

Wara Mamund

Bajaur

Completed

54

Badan Kot

Wara Mamund

Bajaur

Completed

End use of funds

On 29th October 2020, Kurram Welfare Home received the first instalment of 80% of the total fund. A total of 31774.8 US$ has been transferred by the MAUSA in Kurram Welfare Home account. The dollar exchange rate was 158.5 which make it 5036305 PKR, while the dollar exchange rate in proposal was 164.The cash difference occurred due to dollar exchange rate is 174762 PKR. Kurram Welfare Home spent a total of 39436 US$ budget out of 39756 US$.

Fund allocation

Expense US$

S

Project Activities

HR Expense

Project Support

Expense

30456

5800

3180

Village committee pray before starting bore well at Yousuf Abad

Children are taking water from installed hand pump at village Yousuf Abad

Bore hole excavation at Hajilawang

Hand Pump establishment at Hajilawang

Girls are taking water from Water Well at Hajilawang Tehsil Khar​

Excavation in progress at Zara Shah Tehsil Salarzai

Kids are taking water from water well at Zara Shah

Village Committee Praying before starting Excavation at Tangai. Work in progress at Village Tangai

Kids are taking water from Water Well established at Village Tangai Tehsil Salarzai

Girls are taking water from the well established at Khair Abad Tehsil Khar

Excavation in progress at Falang Tehsil Khar

Bore well established at Falang Tehsil Kha

Bore Well Excavation in progress at Shenkotay Tehsil Salarzai. Kids are taking water from well at Shenkotay

Excavation in progress at Chenagai Tehsil Salarzai

Kids are taking water from Well at Chenagai

Excavation in progress at Loesum Tehsil Khar

Kids are taking water from well at Loesum Tehsil